REST operation takes a long time when two different users perform tasks in parallel

Last update date:

5/16/2024

Affected products:

BIG-IP

BIG-IP LTM

Affected releases:

14.1.0

14.1.0.1

14.1.0.2

14.1.0.3

14.1.0.5

14.1.0.6

14.1.2

14.1.2.1

14.1.2.2

14.1.2.3

14.1.2.4

14.1.2.5

Fixed releases:

17.1.1

15.1.10

Description:

Bug ID 1040573: REST operation takes a long time when two different users perform tasks in parallel ... A considerable delay is observed when different users attempt to execute multiple iControl Rest (iCR) requests in parallel. ... The below restjavad error log will be observed as async context's state expired before icrd times out during delay in processing requests. ... This error can be observed when there is considerable delay in request processing irrespective of single user or different users. ... [WARNING][7777][25 Jan 2024 16:09:47 UTC][RestOperation] Exception in POST http://localhost:8100/mgmt/shared/appsvcs/declare failed. ... Multiple iControl REST operations are performed by different users in parallel. ... When attempting multiple requests by single or multiple users with and without bulk config, the following behaviors are observed: 5 ICRD children getting spawned successfully and same are being observed in logs and noticed that these children are serving multiple res...

Additional Resources / Links

Share:

BugZero® Risk Score

What's this?

Coming soon

Status

Verified

Learn More

Search:

...