BugZero found this defect 500 days ago.
Data sources
All data on this page is proprietary to BugZero® or gathered from public sources
5/3/2024
BIG-IP
BIG-IP PEM
13.1.0
13.1.0.1
13.1.0.2
13.1.0.3
13.1.0.4
13.1.0.5
13.1.0.6
13.1.0.7
13.1.0.8
13.1.1
13.1.1.2
13.1.1.3
17.1.0
16.1.4
When receiving Gy CCA Multi-Services-Credit-Control.Result-code:4012 (Diameter_Credit_Limit_Reached),Final-Unit-Action (Redirect) and "Redirect-Server-address" is NOT installed on the PEM session. ... Impact ... The action specified in FUI does not get applied to the session. ... Quota management will not work properly for the session. ... Conditions ... Session quota information is passed from OCS to PCEF on the Gy interface. ... Workaround ... None ... Fix Information ... For the case where the PEM receives a CCA with a result code: 4012 and FUI, added changes to install FUA on the session. ... Behavior Change